All leads are double-stitched and over-locked with polyester thread for extra strength.
Long Leads
$40.00
or 4 payments of $10.00 with Afterpay
Description
The 5 m long dog lead is made of gentle-on-the-hands brushed polyester webbing. It is double-stitched and over locked with polyester thread for extra strength. Single Leads come with quality snap hooks and “D”-rings in strong metal alloy with attractive, long-wearing nickel finish.
Additional information
Weight | 0.2 kg |
---|---|
Dimensions | 17 × 8 × 2 cm |
Colour Options |
Reviews
There are no reviews yet.